Construction and renovation
- Construction dust and agreed residues
- Floors, surfaces and fittings
- Window by project scope
Construction, Renovation & deep cleaning
Construction dust, heavy soiling or facade surfaces need a different preparation than a normal regular cleaning. We clarify material, procedures and access first.
Schedule it after work that creates fresh dust and residue. Tell us which trades still need access and when the property is due for handover. If rooms are finished at different times, we can discuss cleaning in stages rather than unnecessarily repeating the same area.
No. Please identify these residues beforehand and provide photos if possible. The surface, coating and type of residue determine which method is suitable. Sensitive surfaces need assessment before treatment; removal is not a blanket promise for every material.
Procedures
The wrong medium or too high pressure can cause damage. Therefore, sensitive materials, residues and safety conditions are clarified before execution.
Project clarification
For a reliable offer we need space, type of soiling, material, access and appointment. External costs or disposals will only be charged according to a proven agreement.
The execution is coordinated with other work on the construction site or in the property, so that cleaned areas do not immediately pollute again.
Before starting work
After construction or renovation work, dust, paint residues, protective films and building material residues can come together. We first check what can be safely cleaned with.
Read more: Final construction cleaning before handover.
quote
Photos help with the first assessment, but do not always replace the viewing in larger or sensitive areas. Only then do we define procedures, scope and pricing logic.
Read more: Construction cleaning costs.
Free Checklist
The checklist separates open construction work, sensitive surfaces, logistics and actual cleaning scope.
For first occupancy and construction completion, we agree which areas are finished and released for cleaning. Outstanding trades, delicate new surfaces and access are coordinated beforehand. Debris clearance and disposal must be included explicitly; final fine cleaning does not automatically cover them. Prepare the specification, areas, material details and acceptance dates.
A handover sheet can record the material, manufacturer guidance, protective film, existing damage and site-management approval. The method for new coatings, glass and natural stone cannot be chosen from a photograph alone. Where needed, agree test areas and compatibility before treating the remaining surfaces. Identify cement, adhesive and paint residues separately rather than grouping them under general construction dust.
Agree which rooms will be finished and accessible at the cleaning appointment. Later drilling, painting or installation may require another clean. Keep a shared list of cleaned areas, outstanding items, responsibilities and follow-up dates. Include construction debris, protective materials and special waste in the quote with waste categories and responsibility for disposal.
Complete a one-off cleaning project
A visit prevents unclear expectations and unnecessary surprises.
Construction or deep cleaning requests